![]() The results of the hierarchy of dominant response criteria in sequence, namely: economic/cost criteria, time efficiency, ease of implementation, and criteria for transportation of architectural materials. The configuration of 3 tower cranes is carried out by analyzing hierarchical decisions using the Analytical Hierarchy Process (AHP) method with the selection of the best alternative configuration. The approach taken is to use risk management based on the dominant risk response analysis to make relevant strategic decisions. ![]() And also carried out an analysis of risk management so as to achieve optimization of tower crane vertical transportation operations. For this reason, an analysis of the optimization of tower crane operations is carried out in terms of human resource factors, material resources, method resources, and environmental conditions. The Holland Village Jakarta project is experiencing obstacles to the efficiency of construction completion which has not been in accordance with duration of the time schedule set. In the implementation of high-rise building projects, tower crane vertical transportation operations are very decisive as the most important means for lifting and transporting material supply on each working floor. This thesis discusses the operation of tower cranes in high-rise building construction.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |